Wittur Tools
 Verify your product
May 14th, 2013 - Suzhou

Wittur Academy China Official Opening

Descripción

On May 14th the Wittur Academy Asia Pacific was opened with an inauguration ceremony at Wittur Production plant in Suzhour, a-in the presence of Dr. Walter Rohregger, CEO of Wittur Group; Mr. Sergio Biglino, WIttur Vice President of Asia Pacific; Wittur Executive Management Board Members; and Mr. Li Shaohua, Managing Director of Wittur China.

The ceremony was introduced by Cicy Leng, project manager of WA Asia Pacific; Kenneth Aberg, Dean of WIttur Academy Asia Pacific; and Franco Roccheggiani, Dean of Wittur Academy Europe.

After the official cut of the ribbon, Mr. Aberg introduced the Wittur Academy concept to the team. Mr. Nijs Wenas, R&D Director Wittur China, presented the new test elevator and the new test Center recently erected in the same building.
Team members then performed a demonstration of door assembly in the workshop area.

Configuraciones

Code Posición Serie Tipo de puerta Ilustración Paso libre min. (mm) Paso libre máx. (mm) Altura min. (mm) Altura máx. (mm)
01/C    01/C 700 1100 2000 2200
11/L      11/L 700 1100 2000 2200
11/R      11/R 700 1100 2000 2200